ABBOTT WASTEWATER

PHASE 1 & PHASE 2

Contract Amount
$6.2 MM
Duration
8 months
Contract Type
Lump Sum
Location
Casa Grande, AZ
Market

Industrial

Owner

Abbott Nutrition

General Contractor

ARCO Murray

Architect

Fishbeck

Engineer

Fishbeck

Market

Industrial

Owner

Abbott Nutrition

General Contractor

ARCO Murray

Architect

Fishbeck

Engineer

Fishbeck

Project Description

  • Phase 1
    Construction of an equalization influent pump station.
    Construction of a two-tank equalization system including mixing and
    aeration equipment.
    Construction of an equalization building.
    Construction of a pH neutralization system.
    Construction of an odor control system.
    Construction of two oil-water separators.

 

  • Phase 2
    Extension of a process wastewater force main from the Wastewater
    Equalization System to the Wastewater Pretreatment System.
    Construction of a biological treatment system.
    Construction of a process wastewater cooling system.
    A waste biomass dewatering system.