ABBOTT WASTEWATER
PHASE 1 & PHASE 2
Contract Amount
$6.2 MM
Duration
8 months
Contract Type
Lump Sum
Location
Casa Grande, AZ
Market
Industrial
Owner
Abbott Nutrition
General Contractor
ARCO Murray
Architect
Fishbeck
Engineer
Fishbeck
Market
Industrial
Owner
Abbott Nutrition
General Contractor
ARCO Murray
Architect
Fishbeck
Engineer
Fishbeck
Project Description
- Phase 1
Construction of an equalization influent pump station.
Construction of a two-tank equalization system including mixing and
aeration equipment.
Construction of an equalization building.
Construction of a pH neutralization system.
Construction of an odor control system.
Construction of two oil-water separators.
- Phase 2
Extension of a process wastewater force main from the Wastewater
Equalization System to the Wastewater Pretreatment System.
Construction of a biological treatment system.
Construction of a process wastewater cooling system.
A waste biomass dewatering system.