PIMA COMMUNITY COLLEGE

Buildings J & H

Contract Amount
$4.7MM
Duration
14 months
Contract Type
Hard Bid- Plan & Spec
Location
Tucson, AZ
Sun mechanical logo in the white theme.
Market

Higher Education

Owner

Pima Community College

General Contractor

Chasse Building Team

Architect

DLR Group

Engineer

KC Mechanical Engineering

Project Description

The project consisted of a complete renovation to buildings J & H along with new additions to both wings. All mechanical and plumbing systems in the existing footprint were removed and replaced with new systems to serve new classrooms, skills/teaching labs, and community/common areas in support of the Center of Excellence in Health Professions disciplines.

The HVAC system was a variable air volume (VAV) system utilizing chilled water to serve air handling unit coils for space cooling. Terminal units utilized hot water reheat coils for added comfort control to individual zones. Specialty plumbing systems included medical air, oxygen, and vacuum used to serve the teaching labs as well as deionized water for sterilization and disinfection processes.